Presentation

Presentation

Within the Environment Business Unit, NEO2 has been developing partnerships with water and waste treatment companies since its creation. Established in this sector for over 15 years, NEO2 knows how to put its technical know-how at the service of its clients and consultants.

Sub-sectors

Water treatment

  • Production of drinking water
  • Seawater desalination
  • Distribution networks
  • Treatment of urban wastewater
  • Sludge treatment
Water treatment

Industrial effluent treatment

  • Treatment of industrial wastewater
  • Air and odor treatment
  • Flue gas treatment
Industrial effluent treatment

Waste treatment

  • Sorting center
  • Incineration of household waste
  • Organic waste / Biological sectors
  • Incineration of hazardous waste
Waste treatment

Recovery

  • Waste-to-energy recovery
  • Organic waste recovery
  • Methanation
  • Biogas
  • Cogeneration
Recovery

Disciplines

Technical environment

Production of drinking water

  • Screening
  • Flocculation
  • Settling
  • Ozonation
  • Filtration
  • Seawater desalination
  • Reverse osmosis

Treatment of wastewater

  • Sludge treatment

Process water treatment

Incineration and treatment of municipal waste (UIOM)

Incineration and treatment of industrial waste

Waste-to-energy / cogeneration

Methanation

Responsabilities

Definition of treatment processes

Preparation of PID and PFD

Equipment sizing

HAZOP review

Interface management (equipment, Engineering Office, Automation, Instrumentation)

Technical environment

Equipment

  • Reactors
  • Columns
  • Furnaces
  • Vessels
  • Storage Tanks
  • Plate Heat Exchangers
  • Tubular Heat Exchangers
  • Boiler

Tools

  • Microprotol
  • Sicap
  • Autocad

Standards and Regulations

  • Mechanical standards : ASME, CODAP, AD-Merkblatt, TEMA
  • Regulations : RCC-M, DESP, etc.

Responsibilities

Preparation of technical requisitions and specifications for equipment consultations

Preparation/verification of calculation notes

Technical evaluation of suppliers’ offers

Verification of manufacturers’ documents

Monitoring of subcontractor and supplier contracts

Technical environment

Specific equipment

  • Screen rack
  • Washer
  • Air treatment

Rotating machines

  • Pump
  • Compressor
  • Agitator
  • Turbine

Piping an valves

  • Steel
  • Duplex
  • Superduplex

Boilermaking

Thermal

  • Boiler
  • Exchanger
  • Furnace
  • Dryer

Responsabilities

Analysis of the client contract

Definition of the project’s technical lots

Preparation of technical specifications

Preparation of calculation notes

Technical evaluation of supplier offers

Monitoring of supplier contracts

Support for commissioning teams

Technical environment

Voltage / Current

  • Ultra or Extra HV (300 kV – 1200 kV)
  • HVB (>52 kV)
  • HVA or MV (1 kV – 52 kV)
  • LV (50 V – 1 kV)
  • High current
  • Low current

Materials

  • HV / LV cells
  • Transformers
  • HV / LV substation
  • Main Low Voltage Switchboard
  • HV / MV circuit breakers
  • Drives / inver
  • HV / LV Cables
  • Lighting

Tools

  • CANECO HV / LV
  • See Electrical
  • Dialux

Responsabilites

Design of HV / LV single-line diagrams

Power balance

Calculations

  • HV / LV cables
  • Short-circuit levels
  • Etc.

Studies

  • Selectivity
  • Stability
  • Harmonics
  • Power factor

Monitoring of electrical diagrams

Preparation of technical specifications

Contract monitoring

Technical Environment

Materials

Sensors

  • Pressure
  • Temperature
  • Level
  • Flow
  • Transmitters

Analyzers

Valves

  • Régulation
  • On / Off
  • Manual
  • Butterfly

Standards and Rules

  • ATEX, API, etc.

Tools

  • Intools

Responsabilites

Preparation of the instrumentation list

Detailed specification of instruments and DataSheets

Preparation of detailed assembly drawings (hook-up)

Preparation of standard connection diagrams

Participation in FAT/SAT

Contract monitoring

Technical Environment

Materials

  • DCS
  • PLC
  • Instruments (flow, pressure, temperature, etc.)

Suppliers

  • Foxboro
  • Yokogawa
  • Honeywell
  • Schneider Electric

Softwares

  • TEC4
  • Toolset
  • Desigo Toolset
  • PL7 PRO
  • Unity
  • Intools
  • Distech
  • Wago

Responsabilites

Design of the control system architecture

Production of general specifications

Production of functional analysis and logic diagrams (organic analysis)

Production of the input/output list

Hardware and software specification

Subcontractor follow-up

Wiring diagram verification

FAT/SAT realization

Technical Environment

Rotating Machines

  • Pumps, compressors, superchargers, agitators
  • Turbines

Specific equipment

  • Pretreatment (screen, scraper bridge, washer, etc.)
  • Valves and vanes
  • Boilermaking (tank, etc.)
  • Handling, lifting, metalworking (cranes, etc.)

Thermal

  • Boiler
  • Furnace (fluidized bed, etc.), dryer and exchanger
  • Burner

Software

  • PDMS
  • Microstation
  • PDS
  • Autocad 2D/3D

Responsabilites

Supervision of the preparation of :

  • General layout plans
  • Structural and building plans
  • GC guide plans
  • Overview plans
  • Electrical diagrams
  • Process diagrams (PFD and PID)
  • Erection and support plans
  • Isometrics

Operating, maintenance, ergonomic and safety constraints

Management of external designers or engineers

Technical Environment

Lots

  • Concrete
  • Metal Structures
  • Linear Infrastructure(roads, railways)
  • Public Works (urban development, public Spaces)
  • Earthworks
  • Foundations
  • Structural Work
  • Artistic Structures
  • Hydraulic and Maritime Works

Standards

  • Eurocodes
  • AFNOR (French Standards)

Tools

  • REVIT
  • AutoCAD
  • TEKLA
  • Ansys
  • Robot Structural Analysis
  • SolidWorks

Responsabilities

Preparation of General Specifications and Documentation

  • Preliminary Design (APS)
  • Detailed Design (PRO)
  • Work Verification (VISA Travaux)
  • Tender Documentation (DCE)
  • Project Management (DET)
  • Acceptance of Work (AOR)

Selection and Validation of Implementation Methods

  • Construction
  • Assembly
  • Testing

Selection of Suppliers & Subcontractors

Project Management

  • Supervision of Work
  • Scheduling & Cost Management

Verification of As-Built Documentation (DOE) and Reconciliation Plans

Reporting and Summary Preparation

Technical Environment

Planning

  • MS Project
  • Primavera P6

Document Management (GED)

  • Contract Documents
  • Technical Documents
  • Document Updates
  • Version Control

CRM (Customer Relationship Management)

  • Microsoft Dynamics
  • Salesforce
  • BoondManager

Responsabilities

Contract Analysis and Development (FIDIC, etc.)

Establishment of Project Organization and Recruitment of Teams

Client Relationship Management (International and/or France)

Project Planning Management and Monitoring

Budget Management and Monitoring

Team Management (Engineering, Construction, Project Control, Project Management) and Subcontractors

Dispute and Claim Management

Projects

Biogas

Project :

Wastewater treatment plants aim to treat urban wastewater before it is discharged into watercourses. They are generally installed at the end of a wastewater collection network (domestic and urban wastewater and, by extension, industrial or agricultural wastewater) and just upstream of the outlet of the water to be treated. The steps are water pretreatment, biological treatment, control and then discharge into the river.

The sewage treatment plant (WWTP) called Seine Aval and located in Achères in the Yvelines is the largest WWTP in Europe and the second largest in the world. One of the sections has the characteristic of producing biogas from the anaerobic digestion of the sludge produced. This biogas helps to meet some of the energy needs of the wastewater treatment plant.

Description :

Since 2014, Neo2 has been involved in this project at different levels and on different technical lots, including the part dedicated to biogas production :

• Writing technical specifications, supplier consultations, management of selected suppliers until delivery on the valves lot representing approximately 2.7 million euros.
• Providing the interface on the different mechanical lots between the study, works and commissioning phases in order to ensure the smooth progress of the project phases in compliance with safety, costs and deadlines.
• Administering the equipment and project database, training and assisting new users, and coordinating in-house teams.

Automatisme
Dessalement

Drinking Water Production/Desalination

Project :

Seawater desalination is an effective means of combating water stress in arid coastal regions. It is also an appropriate means of providing drinking water in areas where natural resources are subject to salinization (rivers, estuaries, inland or underground brackish water, etc.). The two main processes for desalinating seawater are reverse osmosis (a natural and simple water filtration system that allows impurities present in the water to be retained and only water molecules to pass through) and thermal treatment (similar to distillation).

The UMM AL QUWAIN (UAQ) Project is an independent seawater desalination project based on reverse osmosis technology. The plant, as well as the associated intake and discharge facilities, will be developed to produce desalinated water on a coastal site in the Emirate of Umm Al Quwain.

Description :

Since 2020, NEO2 has been involved in this project for the automation lot :

• Produce functional specifications and flowcharts for subcontractors on sludge treatment and chemical addition processes
• Carry out the various factory acceptance tests (Factory Acceptance Test)
• Update technical documents and the PID review

Dimensionnement
Equipement

Incineration

Project :

Waste-to-Energy (WTE) plants are a sector for the recovery and treatment of residual household waste. They have an incineration line comprising a furnace, a boiler and a flue gas treatment module. The heat emitted by the furnace heats a water network, thus producing steam. This steam powers a turbine that generates electricity, which is largely consumed directly on site.

The IP13 project consists in the creation of an Organic and Energy Recovery Unit (UVOE) composed of an Energy Recovery Unit (UVE), an Organic Recovery Unit (UVO) and a river platform, in order to replace the current waste incineration plant in Ivry.

Description :

Since 2018, NEO2 has been involved in the IP13 project :

• Writing specifications, calculation notes and sizing equipment on the compressed air lot
• Costing the various equipment and consulting suppliers in order to best meet the project's needs

Open Positions

Are you interested in working in the environmental sector?

NEO2 is constantly looking for new talent to strengthen our teams and support our customers on meaningful projects.

You can apply directly to our offers or send us a spontaneous application.

Aucun post pour le moment

They trust us